CNC MACHINING · Serbia

Battery swap station frames for a Serbian EPC contractor

Three sample reworks with the previous supplier — first article approved first time, batch delivered on schedule.

La situazione

A Serbian new-energy EPC company needed battery swap cabinet structures and vehicle bracket assemblies. Their previous supplier misread the drawings, the sample was reworked three times, and lead times were unpredictable.

Cosa abbiamo fatto

We reviewed the drawings and confirmed the critical tolerances with the buyer's engineer, then selected a workshop with existing new-energy project experience. First article confirmation and sign-off happened before batch production, and we tracked the full production flow and supervised loading.

Il risultato

The sample was approved on the first submission. The batch was completed and shipped on schedule, and the customer passed local project acceptance.

Ci invii un disegno

Bastano un file STEP, un PDF o una fotografia del pezzo. Entro 48 ore riceverà una shortlist, un confronto dettagliato e un calendario realistico.