Battery swap station frames for a Serbian EPC contractor

Three sample reworks with the previous supplier — first article approved first time, batch delivered on schedule.

الوضع

A Serbian new-energy EPC company needed battery swap cabinet structures and vehicle bracket assemblies. Their previous supplier misread the drawings, the sample was reworked three times, and lead times were unpredictable.

ما فعلناه

We reviewed the drawings and confirmed the critical tolerances with the buyer's engineer, then selected a workshop with existing new-energy project experience. First article confirmation and sign-off happened before batch production, and we tracked the full production flow and supervised loading.

النتيجة

The sample was approved on the first submission. The batch was completed and shipped on schedule, and the customer passed local project acceptance.