A process with gates, not promises

Every step has a checkpoint and a document. Nothing moves forward until you approve what came out of the previous one.

01

Send your RFQ

Tell us what you need: specification, drawing, reference photo, target landed cost, quantity and deadline. If you only have a photo of a competitor's product, that is enough to start.

You do this once — 10 minutes
02

Supplier screening

We search the market, filter out trading companies and confirm real production capacity. You receive 3–5 candidates with a comparison table covering price, MOQ, lead time, certification and export experience — plus a note on who we rejected and why.

Gate: you pick the factory — 48 hours
03

Samples & confirmation

We order samples from your shortlisted factories, inspect them on arrival at our office, photograph them side by side, and consolidate everything into one parcel so you compare like for like.

Gate: you approve the sample — 1–2 weeks
04

Factory audit & contract

Before money moves, we audit the factory on site and send the report. Terms are locked in a bilingual contract: specification, tolerances, packaging, lead time, penalty clauses and IP ownership. Deposit is released only after you approve the audit.

Gate: audit approved, deposit released — 3–5 days
05

Production, in-line check & final inspection

You get weekly progress updates with photos. At 20–30% completion we run an in-line inspection to catch problems while they are still cheap to fix. Before shipping, a final AQL random inspection decides whether the batch passes.

Gate: inspection report approved, balance paid — 2–5 weeks
06

Consolidation, shipping & delivery

Goods from all suppliers arrive at our warehouse, we verify quantities, pack to export standard, book freight and prepare the full document set. You receive loading photos, container seal number and tracking until delivery.

Gate: goods received at your door — 3–40 days by mode
Quality control

What we check, and when

We work to ANSI/ASQ Z1.4 (ISO 2859-1) sampling. Default is General Inspection Level II.

StageWhenWhat we verifyOutput
Pre-production Before mass production Raw materials, components, colour and specification match to approved sample Material confirmation report
In-line (DUPRO) 20–30% completion Workmanship, dimensions, function, early defect trends, packing method Interim report + corrective action
Final random (FRI) 80–100% packed AQL sampling: appearance, function, dimensions, labelling, carton strength, quantity Pass / fail verdict with defect photos
Loading supervision Container stuffing Carton count, condition, stacking, container seal number Loading photo set + seal record

AQL, in plain English

AQL (Acceptable Quality Limit) is the number of minor defects tolerated in a random sample. For most consumer goods we use 2.5 for major and 4.0 for minor. Critical defects — anything unsafe or illegal — are zero tolerance, always.

  • Critical: 0 accepted (safety, regulation, broken function)
  • Major 2.5: noticeable defect, customer would complain
  • Minor 4.0: small cosmetic issue, customer would not return

If a batch fails

Failed batches do not ship. The factory reworks or remakes at their own cost, and we inspect again before release. Because balance payment is tied to your approval of the report, you are never pressured to accept something you are not happy with.

  • Defect catalogue with severity and count
  • Root-cause note from the factory
  • Re-inspection at factory cost
  • Your approval gates every payment
Timeline

Realistic timeframes

These are typical, not sales promises. We will tell you if your deadline is not achievable.

48h
Supplier shortlist
1–2wk
Sampling & approval
3–5wk
Mass production
3–40d
Transit by mode
First order vs. repeat order: a first order usually takes 4–8 weeks door to door because of sampling and audit. Once the factory and specification are locked, repeat orders typically drop to production time plus transit only.

Ready to send your first RFQ?

Free screening, no obligation. We will tell you honestly whether we can help.

Get a Free Quote