
当时的情况
A Russian engineering contractor building automated parking systems was sourcing lift and frame structures from a Chinese sheet metal shop. Welding distortion was large, deliveries slipped, and the parts did not match on site during installation.
我们做了什么
We shortlisted and visited sheet metal suppliers and qualified two with parking-equipment experience. We ran a drawing and process review with the workshop before tooling, carried out in-process inspection during welding, and full dimensional inspection before shipment. We also coordinated packing, export documents and loading supervision.
结果
Dimensional tolerances held across batches. Mounting holes matched during the customer's own factory test assembly. The order was delivered on schedule and repeat orders followed.